This unit is very versatile. You can have a large garage on the lower level and 2-bed, 2-bath upstairs, or an additional 2 bedrooms behind the garage for a total of 4 bedrooms, or you can even make the room behind the garage into a studio apartment.
DISCOUNTS OFFERED FOR MULTIPLE UNITS.
Submit Ready Floor Plans, engineering and builder packet. | $8,900 |
Panelized Shell Kit. | 98,600 |
Additional cost for up to 100 PSF snow load. | $9,500 |
Additional cost for up to 250 PSF snow load. | $18,965 |
Window and Exterior door package (Anderson 100 Series black composite windows): | $21,850 |
WPC Siding Package.
WPC Siding (wood plastic composite) is made of real wood chips and recycled thermoplastics. This provides a natural wood look that is maintenance free, so you never need to re-stain or paint. |
$7.50 sq ft. |
* Currently only available in Utah, Idaho, Colorado, Wyoming, Montana, Arizona and Nevada.
PAYMENT 1: Design deposit for detailed floor plans and engineering.
PAYMENT 2 : 45% - To purchase all materials, get in the production schedule and begin construction in the factory.
PAYMENT 3: 45% - When the panelized kit is completed and ready to ship.
FINAL PAYMENT: 10% - When the panelized kit is assembled, and our scope of work is completed.After you choose a floorplan, you pay the deposit for the floor plans and engineering. We then contact your local building department to determine the design and engineering requirements for your specific building lot. Engineering requirements are specific to your location depending on snow loads, frost depth, wind loads, seismic requirements, etc. We then complete the plans and engineering specific for your building location. We send you complete, submit-ready floor plans, stamped structural drawings, engineering calcs, construction documents, work orders, cost breakdown sheets, sub-contractor checklists, etc.
After the building permit is issued, your local contractor will complete all the onsite work: excavation, foundation, utility line stub-in’s etc. We provide the floor plans, engineering and instructions for the foundation and onsite work.
When your onsite work is completed, we ship and assemble the shell kit. This includes everything so that the structure of the home is completed, all interior framed walls are installed, stairs are installed, ice and water shield is installed on the roof and the structure of the home is completely weather tight. If you choose to purchase the window and exterior door package, all windows and doors will be installed, and the home will be 100% weather tight. This is usually completed in less than 1 week.
After the shell kit is assembled, local subcontractors complete the rest of the home. This includes siding, roofing, electrical, plumbing, HVAC, insulation, drywall and all finishes such as flooring, cabinets, counter tops, etc. These items are not part of the panelized kit. Labor and materials are provided by local suppliers and sub-contractors. These items usually need to be done by licensed professionals in your state. The subcontractors generally install their own products so they can warranty their work.